Danes Brook

Danes Brook starts its life as Litton Water which rises near Sandway Cross. It flows in an easterly direction to reach Uppper Willingford Bridge where it is joined by waters running down from close to Withypool Cross. It is at this point that it becomes Danes Brook.

From Upper Willingford Bridge it flows in a south easterly direction to flow beneath Lower Willingford Bridge and then on past Cloggs Farm, Wester Shircombe and Shircombe Farm. Turning south past Shircomb Brake, Zeal Brake  and Zeals Farm to reach Slade Bridge at the foot of Anstey Common and then on through Hawkridge Ridge Woods to finally flow beneath Castle Bridge just before its confluence with the River Barle.

Danes Brook flows for an approximate distance of approximately 12.4 kilometres from source to mouth with an elevation fall of close to 205 metres.

Source: 391.1 m or 1283.2 feet – Location :51.08479,-3.72597

Upper Willingford Bridge downstream Arch
Upper Willingford Bridge

Video Gallery

 

Image Gallery  Location Map  Structures